Skip to product information
1 of 8

Vesgantti

Vesgantti Large Modular Sectional Sofa, Big Comfy Cloud Couch with Ottoman Deep Seat Chenille Cloud Sofa, 9 Seater Large Sectional Couches for Living Room, Bedroom and Apartment, Snow White

Vesgantti Large Modular Sectional Sofa, Big Comfy Cloud Couch with Ottoman Deep Seat Chenille Cloud Sofa, 9 Seater Large Sectional Couches for Living Room, Bedroom and Apartment, Snow White

Regular price $2,879.98 USD
Regular price $2,879.98 USD Sale price
Shipping calculated at checkout.

About This

  • Cloud Couch Delivers Cloud-like Comfort: Enjoy the generous 26-inch seat depth and 30-inch ottoman—significantly deeper than others, perfect for stretching out or curling up. The dual-layer cushions combine high-resilience foam with plush filling for lasting luxury. Eight adjustable back cushions and two detachable armrest pillows provide personalized support. The ergonomic design reduces pressure points, ensuring long-lasting comfort for everyone—ideal for extended lounging sessions
  • Fully Modular Design for Customizable Layouts: This modular sofa offers unmatched flexibility, with an overall size of 169"W x 101"D x 35.5"H and seating for 6+ people. You can easily customize the seating arrangement to fit your space and lifestyle. Its rearrangeable components make refreshing the look of your living room effortless, making this cloud sofa both a chic and practical addition to your home. Enjoy the freedom to design your ideal lounging area with this innovative sectional sofa
  • Premium Fabrics in 7 Color Options: Choose from modern chenille or retro corduroy—both fabrics are soft, gentle on the skin, pet-friendly, and easy to maintain. Available in 7 vibrant or neutral colors, it matches perfectly with any decor style. Whether your style is minimalist or vintage-inspired, this 6 seater sectional sofa will add elegance to your space. Note: Slight color variations may occur due to lighting or monitor differences
  • Two Sets of Sofa Legs & Effortless Assembly: This oversized couch comes with two leg height options—2.76" and 4.72"—so you can customize the height to suit your preference. Choose the lower height for a relaxed look, or the higher height for easier access, which also allows robot vacuums to clean underneath with ease. Assembly is simple: with clear instructions and all the necessary tools included, you can have it setup in just 30 minutes with no extra equipment required
  • Durable Construction & Customer-Centric Support: The sofa frame (armrests, backrests, and seat frames) is made from FSC-certified wood, with self-developed reinforced components, our modular sectional sofa offers better stability than others, making it ideal for all body types. This big comfy couch will be delivered in 5 boxes, please check all parts before assembly. If you're not satisfied with the sofa you received, please feel free to contact our customer service team

Overview

  • Brand : Vesgantti
  • Assembly Required : Yes
  • Seat Depth : 26 inches
  • Weight Limit : 2250 Pounds
  • Product Dimensions : 101"D x 169"W x 35.5"H
  • Item Weight : 364 Pounds
  • Type : Sectional
  • Color : Chenille - Snow White
  • Special Feature : Cloud Sectional, Extra-deep Ottoman, Pillow Top Armrest, Removable Cover, Two Sets of Legs
  • Upholstery Fabric Type : Chenille, Corduroy
  • Seating Capacity 9.0 : Style Modern
  • : Seating Capacity 9.0
  • : Style Modern
  • Shape Rectangular : Frame Material Wood
  • : Shape Rectangular
  • : Frame Material Wood
View full details